Bài tập TOEIC Part 7 đoạn đơn có đáp án – Đề 9

8 câu · Trình độ B2, C1 · Làm hết rồi bấm Nộp bài để xem điểm và giải thích.

E-mail

To: Nguyen Hoang Lan <[email protected]> From: Siddharth Rao <[email protected]> Date: 9 September Subject: Order CX-4471 Dear Dr. Nguyen, I am writing with regard to the two refrigerated centrifuges your laboratory ordered on 22 August. During our final inspection, one unit failed to hold its set temperature within the tolerance specified in your purchase contract. Rather than ship equipment that might compromise your results, we have returned both units to our calibration team, who expect to complete the work by 27 September. Delivery, originally scheduled for 15 September, will hence be postponed by roughly two weeks. Aware as we are that your new testing programme begins on 20 September, we would like to offer a loaner unit in lieu of the delayed equipment. It can be dispatched within 48 hours of your confirmation and would remain with you, free of charge, until the permanent units have been installed. Should you accept this arrangement, we will also waive the installation fee of $640 normally charged for this model. Please note that the loaner is a slightly older model with a smaller rotor capacity; it is therefore essential that your staff be informed before running large sample batches. Our technician, Ms. Lucía Ferraz, will brief them on arrival. I would be grateful if you could let me know by 12 September whether you wish to proceed, as the number of loaner units available is limited. Sincerely, Siddharth Rao Client Accounts Manager, Corvane Laboratory Supplies

Câu 1

What is the main purpose of the e-mail?

Câu 2

According to the e-mail, what will Corvane Laboratory Supplies do if Dr. Nguyen accepts the offer?

Câu 3

What can be inferred about Mekong BioAnalytics' new testing programme?

Câu 4

The word "compromise" in paragraph 1 is closest in meaning to

Notice

NOTICE TO ALL RESIDENTS OF CEDARBROOK COURT From: Rafael Ortega, Facilities Coordinator Date: 9 September Following the structural survey commissioned by the owners' board in July, the steel railings on all east-facing balconies have been found to fall short of the revised municipal safety code. Replacement work will therefore begin on Monday, 22 September, and is expected to last approximately three weeks, barring prolonged rain. Contractors from Hallgrave Metalworks will need to enter each affected unit for roughly two hours. Residents on floors 2 through 6 will be visited during the first week; those on floors 7 through 12 thereafter. A detailed schedule will be slipped under your door no later than 17 September. Should the assigned slot prove inconvenient, please contact the management office at least 48 hours in advance so that an alternative can be arranged. It is essential that all plants, furniture, and other belongings be cleared from east-facing balconies before your scheduled visit. Items left in place will be moved by the crew, though the board cannot bear responsibility for any damage incurred as a result. Pending completion of the work, use of affected balconies is to be avoided except when strictly necessary. Residents of west-facing units are unaffected, save for some noise during weekday working hours (8:30 A.M. to 4:30 P.M.). The board regrets any inconvenience and thanks residents for their cooperation.

Câu 5

What is the main purpose of the notice?

Câu 6

According to the notice, what should residents do if their assigned time is unsuitable?

Câu 7

What is suggested about a resident living in an east-facing unit on the ninth floor?

Câu 8

According to the notice, what could delay the completion of the work?

Đã chọn 0/8 câu

Luyện thêm TOEIC có chấm điểm

Làm bài theo trình độ A2–C1, chấm điểm ngay, thi thử đủ đề và xem hồ sơ lỗi của riêng bạn. Miễn phí.

Luyện TOEIC trên web

Luyện mọi lúc trên điện thoại

App PeakScore cho iPhone, iPad: luyện từng Part, thi thử, hồ sơ lỗi. Dùng chung tài khoản với web.

Tải app trên App Store