To: Nguyen Hoang Lan <[email protected]> From: Siddharth Rao <[email protected]> Date: 9 September Subject: Order CX-4471 Dear Dr. Nguyen, I am writing with regard to the two refrigerated centrifuges your laboratory ordered on 22 August. During our final inspection, one unit failed to hold its set temperature within the tolerance specified in your purchase contract. Rather than ship equipment that might compromise your results, we have returned both units to our calibration team, who expect to complete the work by 27 September. Delivery, originally scheduled for 15 September, will hence be postponed by roughly two weeks. Aware as we are that your new testing programme begins on 20 September, we would like to offer a loaner unit in lieu of the delayed equipment. It can be dispatched within 48 hours of your confirmation and would remain with you, free of charge, until the permanent units have been installed. Should you accept this arrangement, we will also waive the installation fee of $640 normally charged for this model. Please note that the loaner is a slightly older model with a smaller rotor capacity; it is therefore essential that your staff be informed before running large sample batches. Our technician, Ms. Lucía Ferraz, will brief them on arrival. I would be grateful if you could let me know by 12 September whether you wish to proceed, as the number of loaner units available is limited. Sincerely, Siddharth Rao Client Accounts Manager, Corvane Laboratory Supplies
Question 1
What is the main purpose of the e-mail?
Answer: A. To explain a delivery delay and propose an interim arrangement
The e-mail says delivery will "be postponed by roughly two weeks" and then offers "a loaner unit in lieu of the delayed equipment." So it explains a delay and suggests a temporary solution.
B. To request payment of an installation fee for a new model is wrong: The writer says he will "waive" the installation fee, so he is not asking for payment.
C. To promote an older centrifuge model with a smaller rotor is wrong: The older model is mentioned only as a warning about the loaner, not as a product to promote.
D. To confirm the start date of a laboratory testing programme is wrong: The start date of 20 September is mentioned as background, not as the main purpose.
Question 2
According to the e-mail, what will Corvane Laboratory Supplies do if Dr. Nguyen accepts the offer?
Answer: D. Cancel the usual charge for installation
The e-mail says "Should you accept this arrangement, we will also waive the installation fee." To "waive" a fee means to cancel the usual charge.
A. Ship both permanent units by 15 September is wrong: The permanent units are delayed, and 15 September was the original date, not the new one.
B. Send a technician to recalibrate the units is wrong: The technician, Ms. Ferraz, will brief staff on the loaner, not recalibrate the units; the calibration team does that.
C. Reduce the purchase price of the centrifuges is wrong: Only the installation fee is waived; there is no mention of lowering the purchase price.
Topic: inversion: conditional with should
Question 3
What can be inferred about Mekong BioAnalytics' new testing programme?
Answer: C. It is likely to start before the ordered units arrive.
The programme begins on 20 September, but the delayed units will be ready only after 27 September and delivered later. So the programme will probably start before the units arrive, which is why a loaner is offered.
A. It will be postponed until the end of September. is wrong: The delivery is postponed, not the testing programme, which still "begins on 20 September."
B. It was rescheduled at Corvane's request. is wrong: Nothing says Corvane asked to change the programme date; the date is the client's own.
D. It was designed for an older centrifuge model. is wrong: The e-mail does not say what model the programme was designed for; the older model is only a temporary loaner.
Question 4
The word "compromise" in paragraph 1 is closest in meaning to
Answer: B. undermine
Faulty equipment "might compromise your results," meaning it could harm or weaken them. "Undermine" has this meaning.
A. settle is wrong: "Settle" means to resolve or agree, which does not fit equipment affecting results.
C. negotiate is wrong: "Negotiate" means to discuss to reach an agreement, which does not fit here.
D. share is wrong: "Share" does not make sense because equipment cannot share results in this sentence.
Topic: vocabulary in context: compromise
Notice
NOTICE TO ALL RESIDENTS OF CEDARBROOK COURT From: Rafael Ortega, Facilities Coordinator Date: 9 September Following the structural survey commissioned by the owners' board in July, the steel railings on all east-facing balconies have been found to fall short of the revised municipal safety code. Replacement work will therefore begin on Monday, 22 September, and is expected to last approximately three weeks, barring prolonged rain. Contractors from Hallgrave Metalworks will need to enter each affected unit for roughly two hours. Residents on floors 2 through 6 will be visited during the first week; those on floors 7 through 12 thereafter. A detailed schedule will be slipped under your door no later than 17 September. Should the assigned slot prove inconvenient, please contact the management office at least 48 hours in advance so that an alternative can be arranged. It is essential that all plants, furniture, and other belongings be cleared from east-facing balconies before your scheduled visit. Items left in place will be moved by the crew, though the board cannot bear responsibility for any damage incurred as a result. Pending completion of the work, use of affected balconies is to be avoided except when strictly necessary. Residents of west-facing units are unaffected, save for some noise during weekday working hours (8:30 A.M. to 4:30 P.M.). The board regrets any inconvenience and thanks residents for their cooperation.
Question 5
What is the main purpose of the notice?
Answer: B. To inform residents about upcoming repair work on certain balconies
The notice says the railings failed the safety code and that "Replacement work will therefore begin on Monday, 22 September." It tells residents about the coming work and what they need to do.
A. To announce the results of a survey of residents' opinions is wrong: The survey was about the balcony structure, not residents' opinions.
C. To introduce a revised municipal code to the building's residents is wrong: The code is only mentioned as the reason for the work; the notice does not introduce or explain it.
D. To request that residents select a contractor for safety work is wrong: The contractor, "Hallgrave Metalworks", has already been chosen; residents are not asked to select one.
Question 6
According to the notice, what should residents do if their assigned time is unsuitable?
Answer: D. Notify the management office at least two days beforehand
The notice says to "contact the management office at least 48 hours in advance." 48 hours is the same as two days beforehand.
A. Slip a written note under the management office door is wrong: The management office does not receive notes under its door; the schedule is slipped under residents' doors.
B. Wait until the second week of the work to reschedule is wrong: Residents must give notice before their slot, not wait until the second week.
C. Contact the contractor directly before 17 September is wrong: Residents must contact the management office, not the contractor, and "17 September" is when the schedule arrives.
Question 7
What is suggested about a resident living in an east-facing unit on the ninth floor?
Answer: A. The resident will probably not be visited before 29 September.
Floors 7 through 12 are visited after the first week, and the work starts on 22 September. So a ninth-floor resident will probably be visited after 29 September.
B. The resident will receive a schedule after the work has begun. is wrong: The schedule will arrive "no later than 17 September", before the work begins on 22 September.
C. The resident is not required to clear his or her balcony. is wrong: The notice says all belongings must be cleared from east-facing balconies, and this resident's unit faces east.
D. The resident will be visited for about two hours every day. is wrong: Contractors need each unit for "roughly two hours" once, not every day.
Question 8
According to the notice, what could delay the completion of the work?
Answer: C. An extended period of wet weather
The work should last about three weeks, "barring prolonged rain." "Barring" means "unless there is", so long rain could make the work take longer.
A. A shortage of replacement steel railings is wrong: The notice does not mention any shortage of railings.
B. A late delivery of the detailed schedule is wrong: The notice gives a deadline for the schedule but does not say a late delivery would delay the work.
D. Noise complaints from west-facing units is wrong: The notice only says west-facing units will hear some noise; it does not mention complaints.
Topic: participle preposition: barring
0 of 8 answered
Practise more TOEIC with scoring
Practise at your level (A2–C1), get your score at once, take full mock tests and see your own error profile. Free.
Practise TOEIC on the webPractise anywhere on your phone
The PeakScore app for iPhone and iPad: practice by part, mock tests, your error profile. Same account as the website.